TLIL Production Entry

Home Production Data

Pending Input Coils
Production Details


Output Coil Details
Produce Output Coil Thickness Width Input Grade Output Grade Output Weight
# SPM No. Width Thickness Input Weight Input Grade Destination Rolling Date Shift Remaining Parts Action
1 C51097 1120 0.6 18.95 P3CR2K TLIL 01-05-2026 B -
2 C51162 914 0.9 17.55 P3CR2BRDIM TLIL 02-05-2026 A -
3 C51179 1120 1 21.84 P3CR2K TLIL 02-05-2026 A -
4 C51180 1250 0.7 22.59 P3CR2K TLIL 02-05-2026 A -
5 C51195 914 0.9 17.49 P3CR2KBRBL/ECL TLIL 02-05-2026 B -
6 C51204 1250 0.8 22.56 P3CR2K TLIL 02-05-2026 B -
7 C51281 1250 0.9 22.37 P3CR2K TLIL 03-05-2026 B -
8 C51306 1250 0.7 22.11 P3CR2K TLIL 03-05-2026 C -
9 C51344 914 1 17.14 P3CR2KBR/ECL TLIL 04-05-2026 A -
10 C51367 914 1.25 17.32 P3CR2BRDIM TLIL 04-05-2026 A -
11 C51379 1250 0.5 22.44 P3CR2K TLIL 04-05-2026 B -
12 C51381 1250 1.2 22.41 P3CR2K TLIL 04-05-2026 B -
13 C51382 1250 0.9 22.24 P3CR2K TLIL 04-05-2026 B -
14 C51387 914 1.25 15.34 P3CR2BRDIM TLIL 04-05-2026 B -
15 C51400 914 0.9 17.32 P3CR2BRDIM TLIL 04-05-2026 B -
16 C51406 914 0.9 17.49 P3CR2BRDIM TLIL 04-05-2026 B -
17 C51407 1250 0.5 22.39 P3CR2K TLIL 04-05-2026 B -
18 C51462 1320 0.9 24.69 P3CR2BRDIM TLIL 05-05-2026 A -
19 C51474 1250 1 22.31 P3CR2K TLIL 05-05-2026 B -
20 C51502 1420 1.2 24.36 P3CR2K TLIL 05-05-2026 C -
21 C51529 914 0.9 17.59 P3CR2KBR/DIM TLIL 06-05-2026 A -
22 C51532 914 1 17.32 P3CR2BRDIM TLIL 06-05-2026 A -
23 C51546 1250 0.6 22.63 P3CR2K TLIL 06-05-2026 A -
24 C51619 914 0.9 17.44 P3CR2BRDIM TLIL 07-05-2026 A -
25 C51626 1250 0.5 22.62 P3CR2K TLIL 07-05-2026 A -
26 C51644 1250 1.2 22.77 P3CR2K TLIL 07-05-2026 B -
27 C51653 1250 1.1 22.45 P3CR2K TLIL 07-05-2026 B -
28 C51682 1250 1.1 22.38 P3CR2K TLIL 07-05-2026 C -
29 C51846 1250 0.4 22.31 P3CR2K TLIL 09-05-2026 C -
30 C51852 1250 1.5 22.39 P3550LA TLIL 10-05-2026 A -
31 C51884 1250 2 0 P3CR2K TLIL 10-05-2026 B -
32 C51919 1320 1.2 24.1 P3CR2BRDIM TLIL 10-05-2026 C -
33 C51947 1250 0.6 22.2 P3CR2K TLIL 11-05-2026 A -
34 C51957 1250 0.5 22.61 P3CR2K TLIL 11-05-2026 B -
35 C52049 1320 1 20.91 P3CR2BRDIM TLIL 12-05-2026 B -
36 C52116 1250 0.5 22.39 P3CR2K TLIL 13-05-2026 B -
37 C52163 1250 0.5 22.58 P3CR2K TLIL 13-05-2026 C -
38 C52276 1320 1 24.75 P3CR2BRDIM TLIL 15-05-2026 A -
39 C52288 914 1 17.29 P3CR2BRDIM TLIL 15-05-2026 A -
40 C52312 1250 0.5 22.7 P3CR2K TLIL 15-05-2026 B -
41 C52317 1250 0.45 22.63 P3CR2K TLIL 15-05-2026 B -
42 C52322 1250 0.4 22.51 P3CR2K TLIL 15-05-2026 C -
43 C52327 1000 0.9 17.24 P3CR2K TLIL 15-05-2026 C -
44 C52353 1250 1.5 21.94 P3370W TLIL 16-05-2026 A -
45 C52387 914 1 17.32 P3CR2BRDIM TLIL 16-05-2026 B -
46 C52396 1000 0.5 17.14 P3CR2K/DCR TLIL 16-05-2026 C -
47 C52404 1320 0.9 24.44 P3CR2BRDIM TLIL 16-05-2026 C -
48 C52415 1540 1 26.98 P3CR2K TLIL 16-05-2026 C -
49 C52718 914 1 17.09 P3CR2BRDIM TLIL 20-05-2026 B -
50 C52887 1250 0.7 23.07 P3CR2K TLIL 22-05-2026 C -
51 C52994 1250 1.35 22.28 P3CR2K TLIL 24-05-2026 A -
52 C53045 900 0.75 14.88 P3CR2K TLIL 24-05-2026 C -
53 C53055 914 0.8 17.41 P3CR2KBR TLIL 24-05-2026 C -
54 C53081 1010 0.5 15.04 P3CR2K TLIL 25-05-2026 A -
55 C53159 1250 0.5 21.65 P3CR2K TLIL 25-05-2026 C -
56 C53165 1420 1 22.66 P3CR2K TLIL 26-05-2026 A -
57 C53167 914 0.9 17.13 P3CR2BRDIM TLIL 26-05-2026 A -
58 C53181 1250 1.4 23.06 P3CR2K TLIL 26-05-2026 A -
59 C53194 1420 1 20.86 P3CR2K TLIL 26-05-2026 B -
60 C53198 1250 1.2 21.99 P3410LA TLIL 26-05-2026 B -
61 C53225 1420 1.2 24.91 P3CR2K TLIL 26-05-2026 C -
62 C53239 1250 0.8 21.84 P3CR2K TLIL 26-05-2026 C -
63 C53353 1250 1.2 21.91 P3410LA TLIL 28-05-2026 A -
64 C53535 1250 0.4 21.97 P3CR2K TLIL 30-05-2026 A -
65 C53536 1250 0.5 21.69 P3CR2K TLIL 30-05-2026 A -
66 C53560 1250 0.6 19.69 P3CR2K TLIL 30-05-2026 B -
67 C53600 1250 1 21.76 P3CR2K TLIL 30-05-2026 C -
68 C53604 1250 0.6 21.9 P3CR2K TLIL 30-05-2026 C -
69 C53653 1250 1.5 18.29 P3CR2550LA TLIL 31-05-2026 B -
70 C53743 1250 1 22.56 P3CR2K TLIL 01-06-2026 B -
71 C53765 1250 0.5 21.67 P3CR2K TLIL 01-06-2026 C -
72 C53778 1250 0.5 21.89 P3CR2K TLIL 02-06-2026 A -
73 C53788 914 1 10 P3CR2KBR TLIL 02-06-2026 B -
74 C53794 1155 0.5 0 P3CR2K TLIL 02-06-2026 B -
75 C53822 914 0.9 17.35 P3CR2KBRBL/ECL TLIL 02-06-2026 C -
76 C53831 1250 0.5 21.67 P3CR2K TLIL 02-06-2026 C -
77 C53882 1250 0.5 21.82 P3CR2K TLIL 03-06-2026 C -
78 C53890 1250 0.5 21.78 P3CR2K TLIL 04-06-2026 A -
79 C53891 1250 0.5 21.75 P3CR2K TLIL 04-06-2026 A -
80 C53917 914 1 17.48 P3CR2BRDIM TLIL 04-06-2026 A -
81 C53918 1250 0.6 21.86 P3CR2K TLIL 04-06-2026 B -
82 C53954 1010 0.5 17.08 P3CR2K TLIL 04-06-2026 C -
83 C53958 1250 0.45 21.86 P3CR2K TLIL 04-06-2026 C -
84 C53981 1250 0.5 20.84 P3CR2K TLIL 05-06-2026 A -
85 C54004 1250 2 20.33 P3410LA TLIL 05-06-2026 B -
86 C54041 1010 0.5 17.32 P3CR2K TLIL 05-06-2026 C -
87 C54097 1010 0.5 16.88 P3CR2K TLIL 06-06-2026 B -
88 C54101 1250 0.5 21.66 P3CR2K TLIL 06-06-2026 B -
89 C54113 1250 0.6 21.67 P3CR2K TLIL 06-06-2026 B -
90 C54147 1250 1 22.06 P3CR2K TLIL 07-06-2026 A -
91 C54158 1250 1 18.92 P3CR2K TLIL 07-06-2026 A -
92 C54169 1250 0.5 21.81 P3CR2K TLIL 07-06-2026 A -
93 C54171 1250 0.5 0 P3CR2K TLIL 07-06-2026 A -
94 C54176 1250 0.5 21.84 P3CR2K TLIL 07-06-2026 A -
95 C54232 1250 0.5 21.29 P3CR2K TLIL 08-06-2026 A -
96 C54244 1250 0.5 21.66 P3CR2K TLIL 08-06-2026 A -
97 C54264 1250 0.5 21.29 P3CR2K TLIL 08-06-2026 B -
98 C54319 1420 0.8 24.59 P3CR2K TLIL 09-06-2026 A -
99 C54327 1270 0.9 21.8 P3CR2KEXP TLIL 09-06-2026 A -
100 C54351 1250 0.5 21.72 P3CR2K TLIL 09-06-2026 B -
101 C54353 1250 0.6 20.28 P3CR2K TLIL 09-06-2026 B -
102 C54355 1250 0.8 22.29 P3CR2K TLIL 09-06-2026 B -
103 C54384 920 0.8 17.43 P3CR2KBR TLIL 09-06-2026 C -
104 C54398 1250 0.45 21.93 P3CR2K TLIL 10-06-2026 A -
105 C54399 1250 0.8 21.74 P3CR2K TLIL 10-06-2026 A -
106 C54414 914 1 17.41 P3CR2BRDIM TLIL 10-06-2026 A -
107 C54415 914 1 16.55 P3CR2BRDIM TLIL 10-06-2026 A -
108 C54422 914 1 17.35 P3CR2BRDIM TLIL 10-06-2026 A -
109 C54472 1320 1 24.58 P3CR2BRDIM TLIL 10-06-2026 C -
110 C54474 1320 1 23.75 P3CR2BRDIM TLIL 10-06-2026 C -
111 C54486 920 0.8 17.31 P3CR2KBR TLIL 11-06-2026 A -
112 C54508 1250 0.7 18.21 P3CR2K TLIL 11-06-2026 A -
113 C54515 920 0.8 17.17 P3CR2KBR TLIL 11-06-2026 B -
114 C54552 1250 0.6 21.93 P3CR2K TLIL 11-06-2026 C -
115 C54564 920 0.8 14.12 P3CR2KBR TLIL 11-06-2026 C -
116 C54566 1250 0.45 22.02 P3CR2K TLIL 12-06-2026 A -
117 C54568 1250 0.6 21.55 P3CR2K TLIL 12-06-2026 A -
118 C54590 1250 0.45 22.07 P3CR2K TLIL 12-06-2026 B -
119 C54711 900 0.7 17.14 P3CR2K TLIL 14-06-2026 A -
120 C54713 914 1 17.27 P3CR2BRDIM TLIL 14-06-2026 A -
121 C54753 900 0.7 16.93 P3CR2K TLIL 14-06-2026 C -
122 C54758 914 0.9 17.23 P3CR2BRDIM TLIL 14-06-2026 C -
123 C54761 914 0.9 17.62 P3CR2BRDIM TLIL 14-06-2026 C -
124 C54764 914 0.9 17.27 P3CR2BRDIM TLIL 14-06-2026 C -
125 C54765 914 0.9 17.61 P3CR2BRDIM TLIL 14-06-2026 C -
126 C54766 914 0.9 17.21 P3CR2BRDIM TLIL 14-06-2026 C -
127 C54794 1250 1 22.09 P3CR2K TLIL 15-06-2026 B -
128 C54800 1250 1.5 22.07 P3CR2K TLIL 15-06-2026 B -
129 C54827 1250 1 22.19 P3CR2K TLIL 16-06-2026 A -
130 C54854 900 0.8 17.09 P3CR2K TLIL 16-06-2026 B -
131 C54912 1320 1 24.52 P3CR2BRDIM TLIL 17-06-2026 A -
132 C54913 1320 0.9 24.44 P3CR2BRDIM TLIL 17-06-2026 A -
133 C54965 920 0.8 17.26 P3CR2KBR TLIL 17-06-2026 C -
134 C55018 914 1.2 17.31 P3CR2KBR/ECL TLIL 18-06-2026 B -
135 C55026 1520 1 0 P3CR2K TLIL 18-06-2026 C -
136 C55038 1060 1.2 19.44 P3CR2K TLIL 18-06-2026 C -
137 C55062 914 1 14.45 P3CR2KBR/ECL TLIL 19-06-2026 A -
138 C55064 914 1 17.44 P3CR2KBR/ECL TLIL 19-06-2026 A -
139 C55108 1000 0.9 17.41 P3CR2K TLIL 19-06-2026 B -
140 C55146 914 1 17.28 P3CR2KBR/ECL TLIL 19-06-2026 C -
141 C55181 1250 0.5 22.18 P3CR2K TLIL 20-06-2026 B -
142 C55219 1250 1.5 23.11 P3CR2K TLIL 21-06-2026 A -
143 C55253 1000 1.2 17.36 P3CR2K TLIL 21-06-2026 B -
144 C55259 914 1 17.55 P3CR2KBR/ECL TLIL 21-06-2026 B -
145 C55266 1250 0.5 21.87 P3CR2K TLIL 21-06-2026 B -
146 C55363 1250 0.7 22.57 P3CR2K TLIL 22-06-2026 B -
147 C55373 1250 0.8 22.36 P3CR2K TLIL 22-06-2026 C -
148 C55399 913 0.97 17.16 P3CR2KBRBL/ECL TLIL 22-06-2026 C -
149 C55407 920 0.8 17.36 P3CR2KBR TLIL 23-06-2026 A -
150 C55437 920 0.8 17.46 P3CR2KBR TLIL 23-06-2026 B -
151 C55460 1250 1.5 21.95 P3CR2K TLIL 23-06-2026 B -
152 C55462 1225 1 22.69 P3CR2K/ECL TLIL 23-06-2026 B -
153 C55466 1540 2 27.35 P3CR2K TLIL 23-06-2026 C -
154 C55566 1250 1.25 22.34 P3CR2K TLIL 24-06-2026 C -
155 C55572 1060 1 19.07 P3CR2K TLIL 24-06-2026 C -
156 C55585 1250 0.8 22.71 P3CR2K TLIL 24-06-2026 C -
157 C55590 914 1.2 17.74 P3CR2BRDIM TLIL 25-06-2026 A -
158 C55604 914 1.2 17.4 P3CR2BRDIM TLIL 25-06-2026 A -
159 C55608 914 1.2 17.31 P3CR2BRDIM TLIL 25-06-2026 A -
160 C55611 914 1.2 17.31 P3CR2BRDIM TLIL 25-06-2026 A -
161 C55719 920 0.8 17.32 P3CR2KBR TLIL 26-06-2026 B -
162 C55748 910 1.4 17.05 P3CR2K TLIL 26-06-2026 C -
163 C55776 920 0.8 17.64 P3CR2KBR TLIL 27-06-2026 B -
164 C55781 1250 2 22.1 P3410LA TLIL 27-06-2026 B -
165 C55795 1250 1.5 22.13 P3410LA TLIL 27-06-2026 B -
166 C55907 1250 0.8 22.31 P3CR2K TLIL 28-06-2026 C -
167 C55929 1250 1.2 21.79 P3CR2K TLIL 28-06-2026 C -
168 C56023 1200 1.5 21.16 P3SAE08/EXP TLIL 01-07-2026 A -
169 C56031 1250 1.2 22.72 P3CR2K TLIL 01-07-2026 A -
170 C56034 1000 0.9 17.32 P3SAE08/EXP TLIL 01-07-2026 A -
171 C56039 1000 0.9 17.5 P3SAE08/EXP TLIL 01-07-2026 A -
172 C56040 914 1 17.15 P3CR2KBR/ECL TLIL 01-07-2026 A -
173 C56148 1250 0.8 22.35 P3CR2K TLIL 02-07-2026 B -
174 C56259 1200 1.2 22.52 P3SAE08/EXP TLIL 03-07-2026 C -
175 C56261 1200 1.5 22.2 P3SAE08/EXP TLIL 03-07-2026 C -
176 C56345 1000 0.8 17.37 P3CR2K TLIL 04-07-2026 B -
177 C56347 1000 0.7 17.45 P3CR2K TLIL 04-07-2026 C -
178 C56375 1200 1.5 22.19 P3SAE08/EXP TLIL 04-07-2026 C -
179 C56376 1200 1.2 22.46 P3SAE08/EXP TLIL 04-07-2026 C -
180 C56377 1200 1.5 22.23 P3SAE08/EXP TLIL 05-07-2026 A -
181 C56379 1200 1.2 22.09 P3SAE08/EXP TLIL 05-07-2026 A -
182 C56396 1200 1.2 21.22 P3SAE08/EXP TLIL 05-07-2026 A -
183 C56402 1200 1.2 22.04 P3SAE08/EXP TLIL 05-07-2026 A -
184 C56456 1250 0.8 22.02 P3CR2K TLIL 05-07-2026 C -
185 C56481 1200 1.2 22 P3SAE08/EXP TLIL 06-07-2026 B -
186 C56494 1200 1.2 0 P3SAE08/EXP TLIL 06-07-2026 B -
187 C56500 1200 1.5 22.19 P3SAE08/EXP TLIL 06-07-2026 B -
188 C56517 1225 1 22.39 P3CR2K/ECL TLIL 06-07-2026 C -
189 C56527 1200 1.2 22.37 P3SAE08/EXP TLIL 06-07-2026 C -
190 C56591 1200 1.2 19.41 P3SAE08/EXP TLIL 07-07-2026 B -
191 C56592 1200 1.2 19.58 P3SAE08/EXP TLIL 07-07-2026 B -
192 C56593 1200 1.2 22.14 P3SAE08/EXP TLIL 07-07-2026 B -
193 C56595 1200 1.2 22.36 P3SAE08/EXP TLIL 07-07-2026 B -
194 C56597 1200 1.2 22.33 P3SAE08/EXP TLIL 07-07-2026 B -
195 C56598 1200 1.2 22.21 P3SAE08/EXP TLIL 07-07-2026 B -
196 C56599 1200 1.2 21.35 P3SAE08/EXP TLIL 07-07-2026 C -
197 C56601 1200 1.2 22.03 P3SAE08/EXP TLIL 07-07-2026 C -
198 C56602 1200 1.2 22.14 P3SAE08/EXP TLIL 07-07-2026 C -
199 C56612 1200 1.2 22.24 P3SAE08/EXP TLIL 07-07-2026 C -
200 C56615 1200 0.75 22.21 P3SAE08/EXP TLIL 07-07-2026 C -
201 C56627 1250 1.2 19.68 P3CR2K TLIL 07-07-2026 C -
202 C56631 1200 1.2 22.11 P3SAE08/EXP TLIL 08-07-2026 A -
203 C56633 1200 1.2 22.32 P3SAE08/EXP TLIL 08-07-2026 A -
204 C56640 1200 1.2 22.31 P3SAE08/EXP TLIL 08-07-2026 A -
205 C56642 1200 1.2 22.03 P3SAE08/EXP TLIL 08-07-2026 A -
206 C56675 1200 1.2 19.7 P3SAE08/EXP TLIL 08-07-2026 C -
207 C56679 1000 1.5 17.43 P3SAE08/EXP TLIL 08-07-2026 C -
208 C56683 1000 1.5 17.32 P3SAE08/EXP TLIL 08-07-2026 C -
209 C56697 1200 1.2 19.44 P3SAE08/EXP TLIL 09-07-2026 A -
210 C56714 1200 1.2 22.53 P3SAE08/EXP TLIL 09-07-2026 B -
211 C56715 1000 1.5 17.44 P3SAE08/EXP TLIL 09-07-2026 B -
212 C56739 1200 0.75 22.39 P3SAE08/EXP TLIL 09-07-2026 C -
213 C56740 1200 0.75 22.1 P3SAE08/EXP TLIL 09-07-2026 C -
214 C56744 1200 0.75 21.14 P3SAE08/EXP TLIL 09-07-2026 C -
215 C56755 1200 1.2 22.16 P3SAE08/EXP TLIL 09-07-2026 C -
216 C56776 1200 0.75 20.93 P3SAE08/EXP TLIL 10-07-2026 A -
217 C56800 1200 1.5 22.33 P3SAE08/EXP TLIL 10-07-2026 B -
218 C56810 1200 0.6 21.32 P3SAE08/EXP TLIL 10-07-2026 C -
219 C56812 1250 0.5 9.97 P3CR2K TLIL 10-07-2026 C -
220 C56821 1000 0.5 16 P3CR2K TLIL 11-07-2026 A -
221 C56830 1200 0.6 22.23 P3SAE08/EXP TLIL 11-07-2026 A -
222 C56834 914 0.9 17.2 P3CR2KBRBL/ECL TLIL 11-07-2026 A -
223 C56847 1200 1.2 22.08 P3SAE08/EXP TLIL 11-07-2026 B -
224 C56878 1200 0.75 22.42 P3SAE08/EXP TLIL 12-07-2026 B -
225 C56888 1200 0.75 22.36 P3SAE08/EXP TLIL 12-07-2026 C -
226 C56889 1200 1.2 22.3 P3SAE08/EXP TLIL 12-07-2026 C -
227 C56935 1200 0.75 21.48 P3SAE08/EXP TLIL 13-07-2026 C -
228 C56938 1200 0.75 21.37 P3SAE08/EXP TLIL 13-07-2026 C -
229 C56942 1200 0.75 22.33 P3SAE08/EXP TLIL 13-07-2026 C -
230 C56959 1200 1.5 22.1 P3SAE08/EXP TLIL 14-07-2026 B -
231 C56962 1200 0.75 22.31 P3SAE08/EXP TLIL 14-07-2026 B -
232 C57029 1250 1.25 19.65 P3CR2K/ROAD TLIL 15-07-2026 B -
233 C57039 1200 1.2 10.21 P3SAE08/EXP TLIL 15-07-2026 B -
234 C57043 1010 0.5 15.27 P3CR2K TLIL 15-07-2026 C -
235 C57069 1000 0.7 17.26 P3CR2K TLIL 16-07-2026 A -
236 C57071 1010 0.5 17.27 P3CR2K TLIL 16-07-2026 A -
237 C57076 1320 1 21.39 P3CR2BRDIM TLIL 16-07-2026 A -
238 C57078 1000 0.8 19.12 P3CR2K TLIL 16-07-2026 A -
239 C57083 1010 0.5 13.59 P3CR2K TLIL 16-07-2026 B -
240 C57155 1320 1 23.87 P3CR2BRDIM TLIL 17-07-2026 A -
241 C57160 1320 1 19.8 P3CR2BRDIM TLIL 17-07-2026 A -
242 C57169 1200 0.75 22.12 P3SAE08/EXP TLIL 17-07-2026 A -
243 C57194 1200 0.75 22.26 P3SAE08/EXP TLIL 17-07-2026 B -
244 C57195 1200 1.5 21.43 P3SAE08/EXP TLIL 17-07-2026 B -
245 C57199 1200 1.2 22.16 P3SAE08/EXP TLIL 17-07-2026 B -
246 C57208 914 1 17.2 P3CR2KBR/ECL TLIL 17-07-2026 C -
247 C57212 1250 1.5 22.36 P3CR2ALK TLIL 17-07-2026 C -
248 C57228 1000 0.9 17.27 P3SAE08/EXP TLIL 17-07-2026 C -
249 C57252 914 0.9 17.23 P3CR2KBRBL/ECL TLIL 18-07-2026 B -
250 C57298 1200 0.6 21.83 P3SAE08/EXP TLIL 18-07-2026 C -
251 C57315 1000 1.5 17.25 P3CR2K TLIL 19-07-2026 A -
252 C57327 1200 1.5 21.391 P3SAE08/EXP TLIL 19-07-2026 A -
253 C57346 914 1 17.51 P3CR2KBR/ECL TLIL 19-07-2026 B -
254 C57377 914 0.97 17.08 P3CR2KBR/ECL TLIL 19-07-2026 C -
255 C57434 1000 0.9 17.55 P3CR2K TLIL 20-07-2026 B -
256 C57443 1200 1.2 22.27 P3SAE08/EXP TLIL 20-07-2026 C -
257 C57446 1200 1.2 21.78 P3SAE08/EXP TLIL 20-07-2026 C -
258 C57447 1200 1.2 21.75 P3SAE08/EXP TLIL 20-07-2026 C -
259 C57521 1200 0.75 22.27 P3SAE08/EXP TLIL 21-07-2026 B -
260 C57558 1200 1.2 19.53 P3SAE08/EXP TLIL 22-07-2026 A -
261 C57654 913 0.97 17.31 P3CR2KBR/TD TLIL 23-07-2026 C -
262 C57656 1200 1.2 22.34 P3SAE08/EXP TLIL 24-07-2026 A -
263 C57663 1200 1.2 22.05 P3SAE08/EXP TLIL 24-07-2026 A -
264 C57664 1200 1.2 22.14 P3SAE08/EXP TLIL 24-07-2026 A -
265 C57665 1200 1.2 22.39 P3SAE08/EXP TLIL 24-07-2026 A -
266 C57746 1200 1.2 22.26 P3SAE08/EXP TLIL 25-07-2026 B -
267 C57789 1000 0.9 17.38 P3SAE08/EXP TLIL 26-07-2026 A -
268 C57880 1000 0.5 18.27 P3CR2K TLIL 27-07-2026 A -
269 C57904 1200 1.2 22.08 P3SAE08/EXP TLIL 27-07-2026 A -
270 C57905 1200 1.2 22.02 P3SAE08/EXP TLIL 27-07-2026 A -
271 C57906 1200 1.2 19.11 P3SAE08/EXP TLIL 27-07-2026 A -
272 C57932 1250 1.5 21.95 P3410LA TLIL 27-07-2026 B -
273 C57936 1250 1.5 21.57 P3410LA TLIL 27-07-2026 B -
274 C57946 1200 1.2 21.48 P3SAE08/EXP TLIL 27-07-2026 C -
275 C57963 1320 1 23.74 P3CR2BRDIM TLIL 27-07-2026 C -
276 C57971 1320 0.9 24.07 P3CR2BRDIM TLIL 27-07-2026 C -
277 C58045 914 1 17.15 P3CR2KBR/ECL TLIL 28-07-2026 B -
278 C58050 914 1.2 17.5 P3CR2KBR/ECL TLIL 28-07-2026 C -
279 C58075 1250 1.5 0 P3CR2K TLIL 29-07-2026 A -
280 C58141 1200 0.75 22.05 P3SAE08/EXP TLIL 29-07-2026 C -
281 C58145 1200 0.6 22.25 P3SAE08/EXP TLIL 29-07-2026 C -
282 C58147 1200 0.6 21.3 P3SAE08/EXP TLIL 29-07-2026 C -
283 C58158 1200 0.6 22.18 P3SAE08/EXP TLIL 30-07-2026 A -
284 C58223 1200 0.75 22 P3SAE08/EXP TLIL 30-07-2026 C -
285 C58227 1200 0.6 22.08 P3SAE08/EXP TLIL 30-07-2026 C -
286 C58255 1200 0.75 22.14 P3SAE08/EXP TLIL 31-07-2026 A -
287 C58385 1200 0.75 22.38 P3SAE08/EXP TLIL 01-08-2026 C -
288 C58444 914 0.9 17.24 P3CR2BRDIM TLIL 02-08-2026 B -
289 C58534 1250 0.5 22.03 P3CR2K TLIL 03-08-2026 C -
290 C58539 1250 0.5 21.92 P3CR2K TLIL 03-08-2026 C -
291 C58544 1250 1.8 22.13 P3CR2K TLIL 04-08-2026 A -
292 C58571 1155 0.5 21.32 P3CR2K TLIL 04-08-2026 B -
293 C58583 1250 0.5 22.45 P3CR2K TLIL 04-08-2026 C -
294 C58599 1250 0.65 22.31 P3CR2KEXP TLIL 04-08-2026 C -
295 C58606 1200 0.6 19.26 P3SAE08/EXP TLIL 04-08-2026 C -
296 C58643 1250 0.5 22.07 P3CR2K TLIL 05-08-2026 B -
297 C58659 1250 0.7 22.36 P3CR2KEXP TLIL 05-08-2026 B -
298 C58666 1250 0.55 22.37 P3CR2KEXP TLIL 05-08-2026 B -
299 C58682 1100 0.5 19.34 P3CR2K TLIL 05-08-2026 C -
300 C58695 1250 0.5 22.47 P3CR2K TLIL 05-08-2026 C -
301 C58697 1250 0.5 22.55 P3CR2K TLIL 05-08-2026 C -
302 C58717 1250 2 22.176 P3CR2K TLIL 06-08-2026 A -
303 C58738 1100 0.5 19.07 P3CR2K TLIL 06-08-2026 B -
304 C58741 1250 0.5 22.63 P3CR2K TLIL 06-08-2026 B -
305 C58752 1270 0.9 22.37 P3CR2K/EXP TLIL 06-08-2026 B -
306 C58780 914 1 17.41 P3CR2KBR/TNECL TLIL 06-08-2026 C -
307 C58822 914 1 17.26 P3CR2KBR/TNECL TLIL 07-08-2026 B -
308 C58824 914 1 17.4 P3CR2KBR/TNECL TLIL 07-08-2026 B -
309 C58853 1200 0.6 21.37 P3SAE08/EXP TLIL 08-08-2026 A -
310 C58897 1250 0.5 22.09 P3CR2K TLIL 08-08-2026 C -
311 C58899 1250 0.5 21.8 P3CR2K TLIL 08-08-2026 C -
312 C58922 1250 0.5 22.15 P3CR2K TLIL 08-08-2026 C -
313 C58925 1250 0.5 22.39 P3CR2K TLIL 09-08-2026 A -
314 C58928 1250 0.5 22.24 P3CR2K TLIL 09-08-2026 A -
315 C58930 1250 0.5 22.14 P3CR2K TLIL 09-08-2026 A -
316 C58933 1250 0.5 22.24 P3CR2K TLIL 09-08-2026 A -
317 C58940 1250 0.5 22.03 P3CR2K TLIL 09-08-2026 A -
318 C58952 1250 0.5 22.09 P3CR2K TLIL 09-08-2026 B -
319 C59029 1250 0.5 22.46 P3CR2K TLIL 10-08-2026 A -
320 C59134 1225 1 22.15 P3CR2K/ECL TLIL 11-08-2026 A -